Gas purification line 4 - Cementos Tequendama – (year 2014)
Capacity: 277,439 m³/h
Gas conditioning emissions control system manufactured by Ingemol.sa for Cementos Tequendama
Tequendama Cements – (year 2010)
Filter area: 1,845 m²
Capacity 110,803 m³/h
Gas conditioning emissions control system manufactured by Ingemol.sa for Cementos Tequendama
Kiln emissions control line 1 and line 2 Cementos Tequendama – (year 2007)
Capacity (96,000 m³/h Each)
Gas conditioning emissions control system manufactured by Ingemol.sa for Cementos Tequendama
Line 4 furnace emissions control Cementos Tequendama – (year 2014)
Capacity (206,867 m³/h)
Contáctanos